MITMARCHSDN. BHD.
Home
Services
Areas
GalleryBlogAboutContact
Call +60 16-297 7925WhatsApp Us

New Roller Shutter
Installation

From the first measurement to the final test run, we supply and fit shutters sized to your opening, your security needs and your daily routine.

About this service

New Shutters Sized
to Your Opening

No two openings are quite the same. Wall material, ceiling height, available headroom and how often the shutter will cycle all shape the right design.

We start with a site measurement, recommend the slat type, gauge and operation method, then fabricate and install the shutter with brackets, guides and locks suited to the wall.

Installation crew on scaffolding fitting a blue industrial roller shutter
Crew on scaffolding

A good installation is decided at the measuring tape, long before the first bolt goes in.

The Mitmarch team
Warning signs

Signs It Is Time
for a New Shutter

Sometimes patching an old unit costs more over the years than a fresh shutter sized correctly for the opening.

Dark steel shutter being installed behind a mobile scaffold
  • !The opening has been renovated. New tiles, ceilings or frames often leave the old shutter too short or too wide.
  • !Rust has eaten through the slats. Corrosion at the lock points weakens the whole curtain.
  • !Break-in marks around the lock. A forced shutter rarely closes as securely again.
  • !Parts are no longer available. Older profiles can be impossible to match slat for slat.
  • !The space has changed use. A store turned warehouse may now need a heavier, motorized shutter.
  • !Several repairs in one year. Repeated call-outs usually point to a unit at the end of its life.

If you are weighing up repair versus new, share a photo of the opening and we will advise.

What is included

What Every
Installation Includes

Every installation quotation lists these items clearly, so you can compare offers without hidden extras later.

01

Site measurement

Width, height, headroom and side space checked on the actual opening.

02

Material recommendation

Galvanised steel, aluminium or polycarbonate chosen to suit security and budget.

03

Fabrication

Curtain, drum, guides and hood made to the agreed size.

04

Mounting and fixing

Brackets anchored to suit brick, concrete or steel structures.

05

Locks and accessories

Centre locks, side locks, padlock eyes or pull handles as needed.

06

Commissioning

Final adjustment of tension or motor limits, then a full demonstration.

Forklift holding a long shutter drum level while the crew prepares the brackets

Measuring the Opening

A new roller shutter installation stands or falls on the measurement. We record the clear width and height, the headroom above the lintel, the space either side for guide rails and the type of wall or column the brackets will bite into. Those figures decide the drum size, the curtain gauge and whether the coil sits inside or outside the opening.

Technicians on a ladder and at floor level wiring a newly mounted shutter motor

Lifting the Drum Safely

Wide shutters arrive as a heavy drum with the curtain already wound on. On larger jobs a forklift or hoist holds the drum level while the crew fixes the brackets, so nobody balances the weight on a ladder. Once the drum is secured, the guide rails are plumbed, anchored and checked for square before the curtain is lowered for the first time.

Shutter crew in hi-vis vests working on a blue roller shutter from scaffolding

Wiring and Handover

Motorized installations finish with the electrical work: the motor is wired, the control box mounted and the limits set so the curtain stops exactly at the floor and at the top. Manual shutters get their spring tension balanced instead. Either way, the last step is a full demonstration so everyone who will use the shutter knows how to open, close and lock it.

Our work

Fresh Roller Shutter
Installations

Measured openings turned into finished shutters, from narrow side doors to wide factory loading bay entrances.

Job-site clips

Crew installing
Transparent counter shutter
Yellow door cycling
Compare options

Manual or Motorized
for a New Shutter?

Choosing how the shutter operates at the start avoids paying for an awkward upgrade a year or two down the line.

Side view of a newly installed dark steel roller shutter with fresh guide rails
We recommend the option after seeing the opening and hearing how you will use it.
PointManual operationMotorized operation
Best suited toSmall and medium openings used a few times a day.Wide or heavy curtains, or shutters opened many times daily.
EffortLifted by hand with spring assistance.Raised and lowered from a wall switch or handheld remote.
Upfront costLower initial price.Higher, because of the motor and controls.
Power cutsWorks without electricity.Needs a manual override chain or crank.
Upgrade pathCan often be motorized later if space allows.Already fitted for remote and wall switch control.
In numbers

A Registered Installer
You Can Check

Our SSM number appears on every quotation, so you always know exactly which company is fitting your shutter.

Newly replaced dark steel roller shutter fully closed in a corridor
2017

Year incorporated

9+

Years in business

14

Services offered

20

Areas covered

Our process

How We Install a
New Roller Shutter

Four stages that keep a new shutter project on schedule and on budget, from tape measure to final test run.

Technician on a ladder fitting the shutter box above a narrow doorway
  1. 1

    Measure and advise

    We visit, measure the opening and discuss usage, security and appearance.

  2. 2

    Written quotation

    Size, material, gauge, accessories and price are set out in writing for your approval.

  3. 3

    Fabrication

    The shutter is made to the confirmed size while we schedule a fitting date with you.

  4. 4

    Fit, test, hand over

    The crew installs, adjusts and runs the shutter, then shows you how to use and care for it.

FAQ

Shutter Installation
Questions

Practical points customers raise before ordering a new shutter, from headroom and walls to colour and floors.

Blue industrial roller shutter being installed at a factory loading bay
How much headroom does a roller shutter need?

It depends on the curtain height and drum size. Taller shutters roll into a bigger coil, so we measure the space above the opening before confirming the design.

Can you install on a glass shop front?

Yes, as long as there is a solid wall, column or beam to carry the brackets. Where there is none, a steel sub-frame can sometimes be added.

Which material is best for a shop lot?

Galvanised steel is the usual choice for security. Aluminium is lighter and resists rust, while polycarbonate suits displays that should stay visible.

Do I need to be on site during installation?

Someone should be present at the start to confirm the position and at the end to receive the handover demonstration.

Can the shutter be painted to match my building?

Powder-coated or painted finishes are possible. Colour options are discussed at the quotation stage.

Will installation damage my floor tiles?

Guide rails are fixed to the walls or columns. Where a floor socket or lock point is needed, we agree its position with you first.

Get a quote

Request a New Shutter
Installation Quote

Share the rough size of the opening and its location, and we will arrange a measurement visit at a good time.

Industrial roller shutter rolled fully open, looking out from a warehouse
Free quotationReply on WhatsApp

Opens WhatsApp. Nothing stored here.